Dear all,

 

I'd like to raise a (currently theoretical) question regarding Retrofit functionality:

 

Usually, Retrofit is only implemented, when you have maintenance systems (DEV, TST, PROD) in parallel to a project landscape (DEV, QA).

Changes created in the maintenance system are retrofitted into the project landscape.

 

 

Now, would it be possible to implement the retrofit idea within a single transport landscape (meaning a landscape of 3 systems DEV, TST, PRD - but no parallel systems)?

Besides CSOL or Downgrade Protection - would it be possible?

 

Does Retrofit need a parallel system landscape or can I implement it without parallel systems.

 

 

Any experience with this setup?

Any objections against this setup (especially from the high-levelled Solman Experts)?

 

Thanks and Regards,

Jan