CHARM: ZMCR not able to proceed once ZMMJ is withdrawn

$
0
0

Hi all,

 

I created a Change Request (ZMCR) with two follow-up Change Documents (ZMMJ) in scope.

For one Change Document, I made changes to the system and imported the TR into production. The final status of this is now "Imported into Production".

For the second Change Document, I withdrew the change document. I did not create any TRs or whatsoever. The final status is "Withdrawn".

 

 

My expectation was, that I can now bring the Change Request to a final status (preferably "Confirmed" or "Realized"), as the change (or part of it) have been implemented.

But I can only set "Scope Extension" or other early status values ("Validation" etc.).

 

 

Can anyone explain, if (and why) this is standard behaviour?

And can anyone guide me how to bring a "half-implemented" Change Request to a good end?

 