Hi all,
I created a Change Request (ZMCR) with two follow-up Change Documents (ZMMJ) in scope.
For one Change Document, I made changes to the system and imported the TR into production. The final status of this is now "Imported into Production".
For the second Change Document, I withdrew the change document. I did not create any TRs or whatsoever. The final status is "Withdrawn".
My expectation was, that I can now bring the Change Request to a final status (preferably "Confirmed" or "Realized"), as the change (or part of it) have been implemented.
But I can only set "Scope Extension" or other early status values ("Validation" etc.).
Can anyone explain, if (and why) this is standard behaviour?
And can anyone guide me how to bring a "half-implemented" Change Request to a good end?
Thanks,
Jan