Since "SAP PPM 6.1 fully deployed in SAP Solution Manager 7.2", does this mean that Template Management in Solman 7.2 is different from Solman 7.1? If so, how would I implement Template Management in Solman 7.2?
Thanks,
Regards,
Mel Calucin
Since "SAP PPM 6.1 fully deployed in SAP Solution Manager 7.2", does this mean that Template Management in Solman 7.2 is different from Solman 7.1? If so, how would I implement Template Management in Solman 7.2?
Thanks,
Regards,
Mel Calucin
Hi Guys,
Please can I get some guidance on making the following changes.
I need to default the values for change documents in the following fields
IT Operator
Change Manager
Thanks
Sameer Alladin
analysts ,
I need to install / Supplementing the Portuguese language in BR solution Manager 7.1 already checked the note 330104 to see what Media / DVD use but did not think anyone could help me .
I've done the settings on SMLT but did not work because I have to install the package.
Please find attached the transaction screens SMLT.
hi all,
i have a problem.
i can't connect the diagnostic agent to solman.
I have tried the smdsetup command and restart the DAA, but haven't solved the problem.
and here is the log file.
May 19, 2016 5:36:14 PM [Thread[Connector,5,main] ] Info [SMDConnector.resetBroker] reset the p4 broker (close:true)
May 19, 2016 5:36:14 PM [Thread[Connector,5,main] ] Info [SMDConnector.resetBroker] p4 broker closed.
May 19, 2016 5:36:14 PM [Thread[Connector,5,main] ] Info Local P4 port opened on port '59804'.
May 19, 2016 5:36:14 PM [Thread[Connector,5,main] ] Info Local P4 server configured with transport layer 'None'.
May 19, 2016 5:36:14 PM [Thread[Connector,5,main] ] Info [SMDConnector.resetBroker] p4 broker initialized.
May 19, 2016 5:36:14 PM [Thread[Connector,5,main] ] Info [p4://10.26.91.29:50004] Checking server availability...
May 19, 2016 5:36:14 PM [Thread[Connector,5,main] ] Warning Connecting to SMD server p4://10.26.91.29:50004 failed - error counter: 9306 - com.sap.engine.services.jndi.persistent.exceptions.NamingException: Exception while trying to get InitialContext. [Root exception is com.sap.engine.interfaces.cross.DestinationException: Cannot establish connection with any of the available instances: 10.26.91.29:50004 Reason: com.sap.engine.services.rmi_p4.P4IOException: Cannot open connection on host: 10.26.91.29 and port: 50004]
And I have checked the java processes are runing in mmc, but not shown in netweaver administrator as attached files. confused
thx
When the user has successfully submitted the ITSM Customer Satisfaction Survey, the system shows the success message "The Values Were Saved Successfully".
We want to change the message. It is probably some OTR element, but I can't find which.
In debugging, I see the value, but can't see where it came from in the BSP.
SAP Note 1074587 points to some OTR elements, but they are not used with the ITSM Customer Satisfaction Survey. Note 1165341 likewise.
Hello Experts,
We have configured ITSM in our Solution Manager, and we are able to create Incidents across the systems through the URL -->
http://<fqdn>:8000/sap/bc/bsp/sap/crm_ui_start/default.htm?sap-client=400&sap-sessioncmd=open.
Now we need to publish the ITSM ticketing URL publically, so that out side of our organization the ticketing URL should be accessible, so we want to publish the URL in the formof --> https://XXX.XXX.com. (https SSL configuration has been done)
I am looking help if anyone can guide me to step forward.
does any one have done such configuration ?, what exact information I will need to provide to our network team.?
your help will be much appreciable..!!
Thanks
Pradeep
http://help.sap.com/saphelp_sm71_sp10/helpdata/en/34/65945176483620e10000000a423f68/frameset.htm
Hi,
i have configured SAP PPM with Integration Charm like mentioned in the following blog.
PPM Projects intergration with Change Request Management as of 7.1 SP10
The only thing which doesn't work is the timesync between the Charm Projekt and the PPM projekt. Can you give me any hints.
Report DPR_CATS_CPRT_TRANSF says ID Project with project type 000000001 does not allow confirmation for the Task.
Thanks in advance.
Hi Experts,
Could you please help me with the procedure to create alert setup on SOLMAN to get certificate expiry alerts of SAP-PI systems .
Note: Certificates are installed on java keystore not on STRUST of ABAP.
I have gone through a link: https://scn.sap.com/thread/3629677
Above link talks about 'Solution Manager - Technical Monitoring' but no more details mentioned how this can be achieved.
Help is appreciated.
Regards,
SP
Hi All
Good day
I had below 3 Reports which causes High Back ground Response Time when running under Background Jobs.
RSCOLL00
/BDL/TASK_SCHEDULER
SDTS_SCHEDULE_CCMS_PAUSES
Please suggest how to improve their performance ?
I am using SAP SOLUTION MANAGER 7.1
Data base: ORACLE Release:12.1.0.2.0
Thanks
Shaik
Hi Guru's,
Please help me with EWA config for JAVA stack 7.4 systems.
Manage system config is already done and wily server is running on solman system. Please guide for the further changes to be done for that particular Java system. I had referred some of the documents, they are unclear. I will appreciate your inputs.
Thanks in advance
We are upgrading Solution Manger 7.1 SP11 to SP14 using SUM 1.0 SP16. We encountered a step where we have to take a database backup of MaxDB, but our hosting team has taken a full system backup already instead of DB backup. Is there any specific way to skip this step as we do not have sufficient space to take a DB backup now.
Thanks,
Phani.
Hey SolMan-Specialists,
is there any possibility to get an systemwide overview (report?) over all (database) connected systems with there own db13 events? We check every day all of our systems in db13 manually (are there any checkdb errors or is there any problem with archive log backup...).
BG
Oliver
Hello,
we are using Solution Manager 7.1 for incident management.
Our current procedure looks like:
Incident --> Change Request --> Change Document
It works like our old 7.0 but we cannot get Key-Users to confirm the tests.
Currently, they can log in and view only their incidents (they see no Change Documents).
Is there any way to let the Users also confirm the tests of their change documents after the test?
The example users provided by the installation (IM_CREAT, IM_PROC....) do not provide any solution.
Any other role than we are using right now will let the users work with the change documents rather then only letting them confirm the test.
Thanky you for any suggestions!
Hello All,
Can somebody help me to find the right way to activate CCMSBI: MONITORING DATA extractors?
After upgrade of managed systems, CCMSBI: MONITORING DATA extractors have stopped working. The error was EFWK HK: PPMS Modelling is not valid. Check PPMS Keys. Following the OSS Note 1798842 - Inconsitent extractors return error "PPMS Modelling is not valid. Check PPMS Keys." I've deleted the failing extractors, updated the system definition in LMDB and re-run Basic configuration -> Configure Automatically -> Setup Extractor Framework and Managed system configuration -> Finalize extractors ->Extractors Setup but the CCMSBI: MONITORING DATA extractors for upgraded systems don't appear yet. Thanks to EFWK_SETUP - Technical Operations - SCN Wiki I found that their setup type is E2EREP - whatever this means - and I may have to run some other Setup configuration in order to activate them.
Any help will be appreciated.
Thank you,
Plamen
Hello,
is there a possibility, that the transport of copies from DEV to QA is automatically done, after releasing the development for test?
So if you click in Normal Change on the action "Release" that it makes the copy and also does the transport?
Or can it only be done via task list/scheduling?
Scheduling would be fine, if it can be done more often than just one day.
Kind regards
I am for the first time setting up CCMS, EWA and Wily in my solman 7.1 sp14 system and I have a few questions which I was unable to find answer.
My landscape is pretty simple it is windows env 2012, oracle db 12 and clustered. ERP 6.0 and EP 7.0 and ofcourse this one solman system.
I am planning to setup a local SLD (means on the solman itself).
Can anyone point me in the right direction in setting up a local SLD? step-by-step would be great.
Hello.
I'm currently planning Solution Manager upgrade project from 7.1 to 7.2. For preparation purpose, I have two short questions.
1) Is TREX mandatory for gaining the advantage of dynamic search on Process Management? I know TREX is necessary for Text searching in ITSM but not sure whether it also would need for Process Management as well.
2) Is HANA DB required for enabling full functionalities of FIORI in Solution Manager 7.2? In the overview presentation, some analytic applications are introduced in Solution Manager 7.2 but I was suddenly concerned with that if it would only work on HANA DB not the other RDBMS.
Best regards,
Seong Do Lee
Hi Folks,
I' d like to know how to stop the technical monitoring/templates during an scheduled outage in the system
Nowadays, for example, when a system is restarted and it is configured into Technical Monitoring a lot of notifications are created saying that the system is down.
I ran the following test and did not work, the notification did not stop creating:
Sm_workcenter
Technical Administration
Work Mode Management
Select the system and click on Work Mode Management
Selec Schedule Work Mode and configure it.
Can anyone help me?
thanks a lot
Hello experts,
We are trying to transport an external request by CHARM, but we are finding many errors.
We made the following steps:
1. we add the data and cofile files in the filesystem usr / sap / trans.
2. we add a request (A) in the ECC DEV and made import.
3. created a request (B) in the ECC DEV by CHARM.
4. encapsulate the external request (A) in the request (B) created in CHARM.
5. try to release the request B, but is occurring the error described bellow.
Error that occurre in the ChaRM:
Erro that occurre in the ECC DEV: