Hi Guys
We are actually migrating and Upgrading an existing Solution Manager 7.01 to 7.1
Since we are performing tests on this Sandbox system, we would like to replicate CHARM configuration and execute full integration tests against managed systems.
There is the actual Productive Solution Manager (SSM), which manages an BW Landscape and a ERP Landscape
If we configure CHARM this Sandbox Solution Manager upgraded to 7.1 (SMT), to manage the same actual BW and ERP Landscape, the configuration would be affected on the original Systems?
In other words, Can we have two CHARM Clients (Test and Productive) to manage BW and ERP Landscape without affecting each other configuration
On the Sandbox CHARM, we only want to test configuration and perform a Change Request Cycle only for testing.
Any comments or suggestions would be much appreciated.
Regards!