I have below query on RBPD.
I have created a Project manually in solar_project_admin & maintained the Business Scenarios, Processes & steps manually in solar01.even I uploaded all the documents for respective nodes.
Now for same managed system I want to Run RBPD, but I dont want to create new project based on RBPD analysis. I want to use the existing project only. Is it possible.
Is it possible to use the existing Bluprint project to update with RBPD analysis.