Currently we are on Solution manager 7.1 Sp12 and have a requirement of configuring jobmon with preceding job condition But the job scheduler is Tidal and the jobs are running there along with preceding condition. We have no connection from solution manager to tidal but the managed systems are connected to tidal . How can be configuration is achieved if in this case , with the preceding job of Job1(main job) vs Job2(preceding job).So any delay in start delay of JOb2 after Job1 finishes we should get an alert also get an alert once job2 ends,
↧