Hi experts,
we are using Solman 7.1 SP8.
There I have the following problem.
I've scheduled a workmode (e.g. 08:00 to 23:00).
If I want to schedule a downtime between 13:00 and 14:00, after the workmode did already start, I always get an error message.
Is there an easy way to schedule downtimes in IT-Calender?
If the affected workmode is not already started, I get asked if I want to postpone/split it, thats ok.
But if it is already started, it does not work.
And the other thing is, if I schedule a downtime for a database i don't get this error.
But in that case 2 workmodes are activate at the same time and it is not switching to the "planned downtime" mode.
Does anybody have an idea on this?
Also, how can I schedule a workmode/downtime on a Host?
Kind regards