Hi friends,
The ChaRM with CSOL and DGP are in test.
To setup CSOL and DGP was inserted the RFC connection in table BCOS_CUST, in manged system. It is necessary to work the verification of the CSOL.
When the Solution Manager is down, the enviroment of the development to stay in error. In this situation I can´t to delete the entry of the table BCOS_CUST, and I can´t to put like inactive the CSOL.
Someone know, if is there a solution or contigence for this situation?
Best regards!
Adriana Medeiros