I am on Solution Manager 7.1 SP 07. After the Request for Change has been approved, the Normal Correction Change document is not generated when setting the status of Request for Change to "Release for Development". It is giving error message "Change Documents cannot be generated" and the status is set back to "Approved". No Change Object ID is generated either.
The project cycle is currently in "Development w/o Release".
The ibase for the production system in the logical component assigned to the Implementation project is setup correctly (as it is autofilling in the Scope Assignment block of the Request for Change)
Background:
Landscape is DEV -> QA1 -> QA2 -> PROD where QA2 and PROD are setup as virtual systems in SMSY, LMDB, and TMS.
I have done the configuration to add the ZMCR -> ZMHF and ZMCR -> ZMMJ with Copying routine AIC001 in SPRO "Define Copying Control for Transaction Types
Any ideas on why the change documents are not generating?