Hello - I'm currently involved in a project that is rolling out a n+1 landscape. The landscape will look like this:
MNT (maintenance): DEV --> QAS --> PRD
PRJ (project): DEV --> QAS
The project landscape is going to be upgraded to newer enhancement packs and Netweaver versions. As an example, the maintenance landscape might be on Netweaver 7.30 and the project landscape on 7.40 (not real, just an example). In a situation like this, how are ABAP code and config changes managed or retrofitted across the two landscapes?
I've been investigating Solution Manager Retrofit as a possible tool to help, but I don't think it will work in this scenario. Can anyone help provide some high level guidance?