Solution Manager 7.1 SP8 SLD configuration.

$
0
0

Dear Experts,

 

We have two system landscapes. As defined below.

 

Production           ECC_RP1      PI_RPP      EP_RPE

Development       ECC_RD1      PI_RD1      EP_RDE

 

As the Production system Landscape central SLD is PI_RPP and the development system Landscape central SLD is PI_RDP.

Now we have installed New Solution Manager 7.1 SP8. we need to configure or insert our two landscape systems central SLD in SOLMAN (LMDB & SMSY) for ECC, PI & EP.

 

how can i move further, pl guide.