I am working with transaction type ZMHF - a standard copy of SMHF. When I create a change document of type ZMHF and assign my maintenance project to it the maintenance cycle created for the project is automatically filled in the change document. But when I save this document I get the following errors:
- there is no active tasklist in the assigned project
- Not linked to an active project
- No link to maintenance cycle.
The document is then is status In development (E0002) and the cycle field is blank again.
When I do the same with the standard SMHF transaction, the document does not give errors and can be processed further and the cycle field stays filled.
Any ideas what is missing or wrong?