Dear Colleagues,
This is Eunhwa.
In the change request managent 'Validation' Status, If I assign charm proejct and then assing the change socpe like ugent change or normal change, the production system which chang should be imported is generated automatically.
However, Although I assigned charm project and change type, the production system was not generated.
Which parts should I check to solve the problem?
Please reply me.
Best Regards,
Eunhwa