SAP Solution Manager 7.1 SP13 OS/DB Migration Suggestion.

$
0
0

Hi All,

 

I am up with a task where in I need to perform OS/DB migration of Solution Manager 7.1 from AIX/DB2 --> WINTEL 2012 R2/MSSQL.

 

In  the Source Solman system we have below things configured.

EWA, MOPZ, Managed System Preparation and Technical Monitoring.We will perform the migration by Export/Import method.

 

The data centre of the source and target Solman system is different and the same is the case with the managed systems which are also getting migrated along with. Monitoring set-up for these new migrated system needs to be configured.

 

Could you please suggest if the effort required in this project would be less than If I would have gone with  a new build of Solman Instead of doing Export/Import.

 

Also what all clean up steps I need to perform for removing the configuration of old systems and hosts.

Can I get the benefit by using source export in the System Preparation and Basic Configuration step.