Hello Experts,
I have upgraded systems which is not included in Chram.As we need to capture Su24 and role changes and system will be refreshed in 1 month.
What will be the strategy to:
- Capture the changes in TP.
- Bring the cahnges after system refresh through Basis.
- Connecting the tp to Chram to move to quality.
Thanks,
Trinetra