Quantcast
Channel: SCN : Unanswered Discussions - SAP Solution Manager
Viewing all articles
Browse latest Browse all 5299

SAP Note 1591595 Content Upload with 2 ERP Logical Components

$
0
0

Dear all,

 

I'm trying to make a RBPD, thus I started with the upload of content of sap note 1591595 .

In step 2. Define Profile I'm required to insert the logical component for each source (eg.: "SAP ERP ECC SERVER").

 

My problem is that our landscape is composed by ECC, BW and XI (production, pre-production, quality and development) for 2 different "sides" of our business. Thus, we have 2 different ERP logical components, 2 BW logical components and 2 XI logical components.

My goal is to map all these components in the same solar01 BBP, starting from analysis project(s?) on both sides.

 

I thought about a possible approach:

I could make 2 analysis projects, then analyze the first and complete that activity with the "create a solution" option.

Then I could analyze the second project, and complete that activity with the "update a solution" option.

This way, I should have a single BBP with all data.

 

Can you plese confirm if this is the correct way to handle similar situations?

 

 

 

Thanks and regards,

ML


Viewing all articles
Browse latest Browse all 5299

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>