Hi All,
I am trying to close a project cycle. But one of the system has been shutdown and decommisioned. Now while closing the cycle it says the RFC to the system is closed. As a result i am not able to close the cycle.
Is there any way without starting up the system again i can close the cycles ?
BR, Alex