Hi all,
We are in the process of configuring and activating Charm in our Solman (7.1 SPs 12) productive system.
After finishing all mandatory steps and while checking Charm configuration in Tx SOLAR_PROJECT_ADMIN, we are getting an error with virtual systems. Seems like those systems are not being treated as virtual and an RFC check attempt is made. The error “RFC cannot be determined” is present under “Check TMS Domain”.
System have been set as “Inactive” in LMDB and defined as Virtual and Locked in their corresponding TMS domain controller. Please also check its status in Tx SMSY.
Is strange however that within the section “System overview for project”, the sub item “Check system” for this virtual system recognizes it as such.
Any ideas on how to solve this?
Thanks in advance.