Quantcast
Channel: SCN : Unanswered Discussions - SAP Solution Manager
Viewing all articles
Browse latest Browse all 5299

Change production sys. in LMDB for an ongoing Charm project

$
0
0

Hi all,

 

We are in the process of configuring Charm on Solman 7.1 SP12

 

In our current scenario, BSD and BSQ have been already upgraded. So they are in the same release. Production system (BSP) however has been not upgraded yet. Therefore, in LMDB there is a system with the above-mentioned SID (BSP). The point is that BSP it is in different release from the rest of the system in the maintenance track (BSD and BSQ).

 

Considering the above described scenario, we are not able to add current BSP in logical component (LC) for BSD and BSQ, and that it is being used within the Charm project, since it has a different product version from the rest of the system in maintenance landscape. Unfortunately we are not able to delete nor modify BSP in LMDB either since is being used in BPmon among other things.

 

We are planning to create a Virtual production system with a different SID (eg BS2) and with the correct release, product versions, in order to be able to include it to the LC currently added to the Charm project.  Work this way until the upgrade process on BSP ends. Then, when BSP is upgraded, and after closing the maintenance task lists, production system will be updated from BS2àBSP in LC. Do you see any constraint
in using this strategy? 

 

Please let me know if was clear enough. 

 

Thanks in advance


Viewing all articles
Browse latest Browse all 5299

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>