I have a situation when ZMIN is already confirmed and no longer editable,
however I am still able to create a new follow up ZMCR document for this incident.
I believe SMIN/SMCR standard behavior is the same.
Is there a way to prevent this ? I.e. I need the "Create follow up" button to be greyed out for status Confirmed in ZMIN.
Thank you
Elena