Hello,
I want to upgrade our BPC/BI system.
Now our system is running on NW 7.01 - BI_CONT 7.05 - SAP CPM BPC ABAP 7.5 .
I've look for technical systems in LMDB and the verification is okey.
But in LMDB, It calculates the target as NW 7.4 with BI_CONT 7.57 but still BPC 7.5
I've looked for BPC 10 in Add-on step but there is no BPC 10.
I've added PDF file for all the steps that I select in MOPZ. Yandex.Disk
Do you have any idea about it?
Regards
Tutku