Dear Experts
I am upgrading Solution Mananger 7.1 SPS 10 to SPS 11, as current SPA level is SPS 10 i want to go for SPS11, i have generated stack.xml file from service market place by selecting the current and target sps level want to upgrade, and in SUM tool i have selected second option as shown in the scteenshot. Please Help me to resolve this issue.
Thanks & Regrads
Mohd Basis