Hello All, We are upgrading BI java from NW 7.01 SPS 13 to NW 7.4 SPS 9. Abap has been successfully upgraded with valid stack file. But BI Java part is not getting calculated in the stack file till NW 7.4, its only going till 7.31. We are not sure why the MOPZ behaves like this for Java upgrade stack calculation, when ABAP stack calculation is successfully done. Note: PAM, notes, Upgrade Paths, everywhere it says that BI java upgrade is possible as ABAP upgrade. Nowhere Java part seems mentioned that its not possible. Please guide if anyone faced this kind of issue. Regards Munish
↧