Hello,
I`m in preperation phase for patching the solution manager plugin tools at the satelite systems, in detail:
From SP08 SAPKITLRD8 -> to SAPKITLRD9 (1 Package via SPAM)
From ST-A/PI 01Q_731 -> to 01R_731 (1 Package via SAINT)
My question is on the SPAU phase, just started the test import for SAPKITLRD9 package and SPAU phase shows up with 4 objects.
When I run SPAU transaction its empty (due to it´s just a test import).
Should the SPAU for ST-PI component be done by SAP Basis or by a developer? Normally there is no customer development in
the ST-PI component. There was this snote (1878184) imported some time ago which solves some ST-PI Bugs and changed 4 objects so I think these modified ST-PI objects are affected by SPAU?
If no developer is needed for this ST-PI Update it would be very time saving if SPAU can be done by SAP Basis.
BR,
Alessandro