Hello Colleagues/ SAP Experts,
Here is a background. 2 weeks ago, we have generated an XML stack file using MOPZ in solman 7.1 for the following systems (P6D which is DEV,
P6Q which is quality, P6R which is regression and P1P which is production). We were at our technical cutover rehearsal phase and the system that we were rehearsing was P6R. But AFTER our technical cutover, a new java component, which is seeburger as2 adapter, was installed in P1P, PRODUCTION. Thus, the landscape of P1P has changed as a new component was introduced and we believe that the generated XML file 2 weeks ago will no longer be valid for P1P. Instead of generating another xml file thru mopz for P1P, we would like to use report RPT_MOPZ_COPY_STACK_XML to convert the XML file OF P6R to map it toP1P. I have uploaded P6R XML and the target is P1P. So as you can see, P6R XML (source) --> P1P target.
Actions already done are the following:
1) Fulfilled and followed the resolution in note: 1711612
RPT_MOPZ_COPY_STACK_XML Report Troubleshooting
2) SAP-OSS is working in SM59
Basically, program RPT_MOPZ_COPY_STACK does not convert the Regression system's xml to the target, which is production. Kindly see attached screenshot. *the screenshot shows only 1 component in error but upon clicking the 'next difference' button, it will still show other components. I have checked my lmdb settings, will there be workaround for the issue?
Regards,
Meinard