Recently upgraded to UFT. Its connected well with ALM 11.0 patch 16. While trying to create or open a BPT test case in UFT , getting message -
" To work with BPT and flows in UFT , you must connect to a BPT -enabled project in ALM 11.50 or later"
As per UFTs PAM, it should be compatible with ALM 11.0 for BPT.
Installed the UFT_000066 and 68 too. Does that mean that we need to upgrade the ALM or anything else needs to be done.
Thanks in advance.