For one Urgent Change while performing the one of the Approval before changing the status to 'To Be Tested'
We are getting below error.
The system does not recognize any changes using the CTS WBS BOM in the development system. The transaction is therefore incorrect or the status was reset by the system.
COuld anyone please help us to know, How it can be resolved?
We also have this below error.
System Response
If the PPF action is a condition check, the condition is initially considered as not met, and leads to another warning, an error message, or status reset, depending on the configuration.
If the PPF action is the execution of a task in the task list, and the exception is critical, there is another error message in the document.
Procedure
The condition cannot be met until the cause is removed. Analyze all messages in the transaction application log.
Procedure for System Administration
Analyze any other messages in the task list application log, and the entries for the object /TMWFLOW/CMSCV
Additional Information:
System cancel RFC destination SM_UK4CLNT005_TRUSTED, Call TR_READ_COMM:
No authorization to log on as a trusted system (Tr usted RC=0).
/TMWFLOW/TU_GET_REQUEST_REMOTE:E:/TMWFLOW/TRACK_N:107
For above error Table /TMWFLOW/REP_DATA_FLOWwas refreshed as well but still the same error.